Boeing 737 Max planes are grounded after a hole blew in one mid-flight::The FAA ordered that 171 Boeing 737 Max 9 planes be inspected before they can return to service following the explosive decompression of an Alaska Airlines flight.

  • circuscritic@lemmy.ca
    link
    fedilink
    English
    arrow-up
    1
    ·
    edit-2
    10 months ago

    That’s the problem… Reusing a 50±year-old design, with new engines and other technology that should have been used with a new fuselage design…

    I don’t think they’d ground the entire fleet if this was just a mechanic who made some one-off error. There’s probably some human error involved, but those on the ground human errors are only catastrophic because of the design choices Boeing made.